The Pipeline System
Space
Page Head
Space

Pipeline design activities undergoing detailed refinement

Preliminary engineering, environmental and other design and planning activities have been underway since late 2005 and significant progress has been achieved.

Through a development agreement process responsive to the needs of engaged parties, the design of the Altex Pipeline System is undergoing detailed refinement to ensure the lowest total transport cost to its contracted shippers.

Areas of design optimization now underway include: the staging of future expansion capacities, diluent choice and blending ratios, route refinement, receipt and delivery point configurations, and schedule.

Currently, some key target design parameters are:
  Initial throughput capacity 425,000 barrels per day
  Pipe diameter 36 inches
  Estimated cost US$5.3 billion
  Projected in-service date 2011 / 2012