The Pipeline System
Space
Page Head
Space

Shippers engaged in process to achieve lowest total transport cost

Altex Energy Ltd. is currently working with several interested shippers, under Confidentiality Agreements, to integrate each of their individual project requirements with the Altex Pipeline System, including bitumen production profiles and technologies. Potential shippers have shown a keen interest in the Altex concept of direct access to the right market at the lowest total transport cost.

Altex is engaged with potential shippers in a formal process that includes presentation of confidential project details focusing on elaboration of its Thermo-LEVR™ and BIRDA™ technologies and the fact that its direct route reduces in-transit inventory costs by up to 70%.

As a result, a number of potential shippers are working directly with Altex under contractual development agreements. An ongoing iteration of route and design refinements has resulted from this process to address identified shipper issues and preferences through review of design, costs and operating philosophy, with the goal to finalize contract terms and conditions.

The resultant long-term transportation agreements will ultimately support applications for the required certificates from the appropriate Canadian and U.S. regulatory authorities.